The installation and welding of the pipelines of an LNG terminal

Material: 1.4307
Pipeline: DN15–DN350

link
 

Manufacturing of complex pressure tanks (assembly and welding) for the oil industry

Materials: EN1.4462; EN1.4362
Material thickness: 8–25 mm

link
 

Shell & tube heat exchanger

Materials: Shell P265GH. Pipes: P235GH
Material thickness: 10–25 mm

link
 

The manufacturing of the evaporator units at the workshop and on-site installation

Materials: 1.4162; 1.4362
Material thickness: 4–25 mm

link
 

Heat exchanger

Materials: Shell 1.4307. Pipes: 1.4404
Material thickness: 6–25 mm

link
 

The welding works of a district heating accumulator

Material: S355J2
Material thickness: 8–25 mm

link
 

The installation and welding of the pipelines for an electricity and boiler plant

Material: P235GH
Pipeline: DN15–DN400

link
 

The installation and welding of the pipelines of a pulp factory

Materials: 1.4307, 1.4404, 1.4462
Pipeline: DN40–DN350

link
 

Metsä Fibre Äänekoski biomill site

Assembly and welding of evaporators.
Materials: Stainless steel, duplx steel

Welding assembly of working machine components and welding

Location: Vieremä

Year: 2019

Fitting and welding

Materials: Stainless steel

Year: 2019

Piping and equipment installation

Materials: Stainlesss steel & Carbon steel

Location: Odda, Norway

Year: 2019

Assembly and installation of Subsea equipment

Materials: Carbon steel

Location: Sannidal, Norway

Year: 2019

Piping prefabrication and welding

Materials: Stainlesss steel & Carbon steel

Location: Porsgrunn, Norway

Year: 2019

Piping installation and welding

Materials: Stainlesss steel & Carbon steel

Location: Stavanger, Norway

Year: 2015

Assembly and welding of air receiver tanks

Material: Carbon steel

Location: Vaasa

Year: 2017

Assembly and welding of storage tanks

Material: Carbon steel & stainless steel

Location: Kotka

Year: 2017-2018

Assembly and welding of filter elements

Material: Carbon steel

Location: Kiuruvesi

Year: 2017

Assembly and welding of conveyor details

Material: Carbon steel

Location: Lappeenranta

Year: 2017

Welding of boiler details

Materials: Carbon steel

Location: Kiuruvesi

Year: 2017

Assembly and installation of pharmaceutical industry equipment

Location: Naarajärvi

Year: 2018

Piping installation and welding

Materials: Stainless steel

Customer: SCA Östrand

Location: Östrands Fabriksområde, 861 32 Timrå, Sweden

Year: 2017

Welding of steel constructions

Materials: Carbon steel

Location: Kurikka

Year: 2017

Piping installation and welding

Materials: Stainless steel

Customer: Stora Enso Imatran tehtaat / Kaukopää

Location: Rantaportintie 5, 55800 Imatra, Finland

Year: 2017

Welding of lampposts

Location: Kangasniemi

Year: 2017-2018

Repair and welding of mining machinery

Location: Raahe

Year: 2017-2018

Piping installation and welding

Materials: Stainless steel

Location: LDC WOOD, Vergunningenstraat 7, 8400 Oostende Belgium

Year: 2017

Assembly of mining machinery

Location: Iisalmi

Year: 2017-2018

Installation, welding and assembly of pumping units

Location: Humppila

Year: 2017-2018

Assembly of Forest machinery

Location: Koivulahti

Year: 2018

Finishing welding of steel casts

Location: Salo

Year: 2017-2018

Welding of steel constructions

Materials: Carbon steel

Location: Iisalmi

Year: 2018

Welding of steel constructions

Materials: Carbon steel

Location: Kuortane

Year: 2017-2018

Welding of steel constructions

Materials: Carbon steel

Location: Keuru

Year: 2017-2018

Repair welding of forgings

Location: Kotka

Year: 2018

Assembly and welding of waste management equipment

Materials: carbon steel

Location: Kerava

Year: 2018

Welding of azipods

Materials: Carbon steel

Location: Taivalkoski

Year: 2016

Assembly, installation and welding of process pipes

Materials: Carbon steel

Location: Jalostamontie 1, 06850 Kulloo, Finland

Year: 2017-2018

Installation and welding of process pipes

Materials: Carbon steel and stainless steel

Location: Hyötiöntie 2, 53200 Lappeenranta, Finland

Year: 2018

Welding and installation of various Pulp & Paper equipment

Materials: stainless steel, duplex, super duplex

Customer: Viafin Terästorni

Location: Lappeenranta

Year: 2015-2018

Welding of evaporators and reactors

Materials: Stainless steel, Duplex steel; Super duplex

Customer: Viafin Terästorni

Location: Södra Cell Värö 432 86 Väröbacka, Sweden

Year: 2015

Welding of 5000 m3 district heating accumulator

Materials: Carbon Steel

Customer: Viafin Terästorni

Location: Hylkeenpyytäjäntie 4, 02270 Espoo, Finland

Year: 2015

Assembly and welding of process tanks and towers

Materials: Carbon steel, stainless steel 1.4404

Customer: Viafin West Welding

Location: Teuva/Harjavalta

Year: 2017

Assembly and welding of heat exchangers

Materials: Carbon Steel, Stainless steel, duplex

Location: Teuva

Year: 2015-2017

Metsä Fibre Äänekoski biomill site. Assembly and welding of evaporators.

Materials: Stainless steel, duplx steel

Customer: Metsä Fibre Äänekoski Biomill

Location: Sarvelantie 2, 44100 Äänekoski, Finland

Year: 2016

Assembly and welding of evaporators

Materials: Stainless steel, duplex steel

Customer: West Welding

Location: Teuva

Year: 2015-2017

Installation of LNG piping

Pipe dimensions: DN15-DN300

Material: Stainless steel

Customer: Viafin Process Piping

Location: Tornio

Year: 2017

Installation of food industry piping

Pipe dimensions: DN 15-DN250

Material: Stainless steel

Customer: Viafin Process Piping / Roal

Location: Ykkimäentie 15, 05200 Rajamäki, Finland

Year: 2016/2017

Installation of LNG piping

Pipe dimensions: DN15-DN300

Material: Stainless steel

Customer: Viafin Process Piping / Skangas

Location: Tahkoluoto

Year: 2015/2016

Pressure equipments and pipes installation and welding

Material: Carbon Steel, Pipe dimensions: DN15-DN500

Customer: Viafin Process Piping

Location: Uusikaupunki

Year: 2015